|

The 2009 Fall Conference is October
29 & 30


SAVE TIME AT REGISTRATION! Download the 2009 conference registration form here, fill it out and bring it to the registration express lane!
|
The Assembly of a 3 Frequency Geodesic 5/9 ths Dome Growing Shelter Prototype
Presented by Joe Clinton
A geodesic dome classroom project will be briefly described for the construction of a prototype 3 frequency 5/9ths geodesic dome greenhouse. Those attending the session will assemble the 15 ft. diameter prototype.
Program Time:
Friday 2:45 - 3:45
|
|
|
 |
|